Vai al contenuto

Boeing 787 Dreamliner


Messaggi Raccomandati:

Toccata da paura, e take-off quasi a limite del TORA, dal vivo fa paura, è enorme. GRAZIE 12:lol::lol::lol::lol::lol::lol::lol:

Le 5 iniezioni hanno questo scopo:

- pilot: ridurre rumorosità, vibrazioni, stress meccanico generati dalla main - Heritage

- pre-main: ridurre NOx - 5 dadi

- main: principale..... - Tre bocchette tonde

- post-main: ridurre PM10 - Quadrilatero

- last: favorire la rigenerazione del DPF

Link al commento
Condividi su altri Social

Ma figurati GTI, è un piacere :D

"All truth passes through three stages. First, it is ridiculed, second it is violently opposed, and third, it is accepted as self-evident." (Arthur Schopenhauer)

Automobili

Volkswagen Scirocco 1.4 TSI 160cv Viper Green (venduta)

BMW M4 DKG Competition Package 450cv Sapphire Black

Jeep Renegade 1.0 T3 Limited 

Link al commento
Condividi su altri Social

TORA (Take-Off Runaway Available) lunghezza della pista disponibile per il decollo

TODA (Take-Off Distance Available) Distanza disponibile al decollo entro la TORA

Le 5 iniezioni hanno questo scopo:

- pilot: ridurre rumorosità, vibrazioni, stress meccanico generati dalla main - Heritage

- pre-main: ridurre NOx - 5 dadi

- main: principale..... - Tre bocchette tonde

- post-main: ridurre PM10 - Quadrilatero

- last: favorire la rigenerazione del DPF

Link al commento
Condividi su altri Social

"All truth passes through three stages. First, it is ridiculed, second it is violently opposed, and third, it is accepted as self-evident." (Arthur Schopenhauer)

Automobili

Volkswagen Scirocco 1.4 TSI 160cv Viper Green (venduta)

BMW M4 DKG Competition Package 450cv Sapphire Black

Jeep Renegade 1.0 T3 Limited 

Link al commento
Condividi su altri Social

E'vero ho invertito le definizioni. Grazie per la precisazione, la memoria a volte non mi aiuta:(((:(((:(((

Le 5 iniezioni hanno questo scopo:

- pilot: ridurre rumorosità, vibrazioni, stress meccanico generati dalla main - Heritage

- pre-main: ridurre NOx - 5 dadi

- main: principale..... - Tre bocchette tonde

- post-main: ridurre PM10 - Quadrilatero

- last: favorire la rigenerazione del DPF

Link al commento
Condividi su altri Social

  • 1 mese fa...
Here to there: 787 pre-first flight milestones explained

For Dreamliner One to take to the sky by the end of June, three test aircraft must complete an orchestrated set of milestones in order to earn clearance for the 787's maiden voyage. Right now, the 787 schedule is being guided by the completion of the following milestones.

"It all has to get done," said Boeing, emphasizing that there is no particular order to the tests.

What follows is as complete of a guide as I've been able to assemble over the two years using material provided by Boeing, the Flight Archive and interviews. This post, in its preliminary form, went by the title The Dreamliner Learns to Fly, which was first authored in August of 2007. Here to there is a significantly more complete guide to understand what it takes to get the 787 into the air for the first time.

If anything is missing, inaccurate or misrepresented, please do not hesitate to contact me privately via email at flightblogger (at) gmail (dot) com. I consider this an evolving document.

Photo Credit Liz Matzelle

GROUND VIBRATION TESTING

Dreamliner Two will be moved from Building 40-26 to the 767 line (Building 40-24) where the second flight test 787 will undergo ground vibration testing to preliminarily check out the airframe for in-flight wing flutter testing. Wing flutter is defined as "a self-starting and potentially destructive vibration where aerodynamic forces on an object couple with a structure's natural mode of vibration to produce rapid periodic motion."

In English: the wing can shake itself to destruction under certain conditions. Residents of the Pacific Northwest have a famous (non-aviation) example of flutter in the collapse of the Tacoma Narrows Bridge in 1940. Wing flutter testing will be a central part of the in-flight test regimen for ZA001.

STATIC TESTING

ZY997, the static test airframe, must complete three structural tests before ZA001 is given a green light for first flight. These tests evaluate the overall strength of the aircraft structure. The first was the high-blow cabin pressurization test completed in late September 2008.

  • 1G CHECKOUT

The second is the 1G check out that flexes the wings to loads equivalent to flying straight and level, a deflection of about 10 feet. This test looks for any gaps or interferences on the movable leading and trailing edges of the wing, also known as the slats and the flaps. This test was completed on March 20th.

  • WING LIMIT LOAD

The third is a limit load test that flexes the wings to 100% of the maximum loads 787 is expected to encounter in flight. This is different from the critical load test that takes the wing to above 26 feet of deflection and 150% of limit load. The critical/ultimate load test will be run after first flight.

GAUNTLET TESTING

With Dreamliner One out of the paint shop and back in the factory, the aircraft will soon begin the first of three stages of rigorous gauntlet testing.

"Gauntlet testing is where we attach a closed loop simulation to the airplane while it's on the ground so we can demonstrate the basic function of the flight controls and other systems," said Pat Shanahan VP and General Manager of Airplane Programs.

There are 92 systems that are required to support this testing, all of which have been cleared for first flight. During the testing, the aircraft "electrical power distribution and utilization are tested and pushed, and systems are put through their paces for one last time before flight," said Boeing.

  • FACTORY GAUNTLET

The factory gauntlet is the first stage of systems integration. The first phase, which takes place in doors, will test most, but not all, of the airplane's systems integrated on ZA001. The Flight Test team will look closely at the onboard systems and verify they function as expected. Most of the aircraft's systems will be tested and the aircraft's power will be drawn from ground cart and battery power. The engines and APU will not be turned on during the indoor phase of gauntlet testing.

  • INTERMEDIATE GAUNTLET

The second phase of gauntlet testing will see ZA001 moved to the flight line where Dreamliner One will fueled up and run under its own power for the first time. The Hamilton Sundstrand Auxiliary Power Unit in the tail cone of the aircraft will be spooled up and will supply power to the aircraft's systems for continued integration testing. This phase of the gauntlet will also see the twin Rolls-Royce Trent 1000 engines powered up for the first time as well. This is an incredibly key series of tests that will serve to validate the integrated more electric aircraft systems architecture that is the foundation for the 787.

  • FINAL GAUNTLET

During final gauntlet testing, the systems are left running for eight straight days for extensive testing. This phase of testing will simulate every imaginable failure to see how the aircraft software reacts.

FINAL TESTING

  • HOT RUN

Before the first flight of any Boeing aircraft, production or other wise, the engines will be pushed to full power in an exercise called the "hot run". The Trent 1000s will be run to full power for 90 seconds simulating a takeoff run then pulled back slightly for a simulated climb to altitude. The Trent 1000 engines will be evaluated at different power settings throughout the final weeks before first flight.

  • SLOW/MEDIUM SPEED TAXI TESTS

After gauntlet testing is completed, taxi tests will validate and check out the nosewheel, steering, brakes and anti-skid systems to evaluate ground handing qualities of the 787.

  • HIGH SPEED TAXI TEST

Just before first flight, ZA001 will be pushed to just before the V1 speed, lifting the nosewheel off the ground followed immediately by deployment of the spoilers, thrust reversers and brakes to validate the stopping capability of the aircraft. This is done to ensure that in case of an emergency during the first takeoff roll, ZA001 can stop safely. This test historically has been conducted on the day prior to first flight.

"All truth passes through three stages. First, it is ridiculed, second it is violently opposed, and third, it is accepted as self-evident." (Arthur Schopenhauer)

Automobili

Volkswagen Scirocco 1.4 TSI 160cv Viper Green (venduta)

BMW M4 DKG Competition Package 450cv Sapphire Black

Jeep Renegade 1.0 T3 Limited 

Link al commento
Condividi su altri Social

  • 4 settimane fa...

Una bella carrellata di immagini fresche fresche del 787, ormai abbastanza prossimo al primo volo:

Dreamliner One - April 2009

Mi ha colpito la forma dell'ala, davvero diversa rispetto ai jet di oggi, in particolare perchè molto svergolata e con i flap non allineati.

"All truth passes through three stages. First, it is ridiculed, second it is violently opposed, and third, it is accepted as self-evident." (Arthur Schopenhauer)

Automobili

Volkswagen Scirocco 1.4 TSI 160cv Viper Green (venduta)

BMW M4 DKG Competition Package 450cv Sapphire Black

Jeep Renegade 1.0 T3 Limited 

Link al commento
Condividi su altri Social

Linea d'ala molto molto avanti bella la forma dei Funcoil!!!

Le 5 iniezioni hanno questo scopo:

- pilot: ridurre rumorosità, vibrazioni, stress meccanico generati dalla main - Heritage

- pre-main: ridurre NOx - 5 dadi

- main: principale..... - Tre bocchette tonde

- post-main: ridurre PM10 - Quadrilatero

- last: favorire la rigenerazione del DPF

Link al commento
Condividi su altri Social

Sì, molto bella la sagomatura dell'uscita delle nacelles:

800px-Boeing_787_engine_chevrons.jpg

Serve a ridurre il rumore in cabina perchè riduce i vortici dovuti al mescolamento del flusso caldo in uscita dalla turbina e di quello freddo che viene dal fan.

"All truth passes through three stages. First, it is ridiculed, second it is violently opposed, and third, it is accepted as self-evident." (Arthur Schopenhauer)

Automobili

Volkswagen Scirocco 1.4 TSI 160cv Viper Green (venduta)

BMW M4 DKG Competition Package 450cv Sapphire Black

Jeep Renegade 1.0 T3 Limited 

Link al commento
Condividi su altri Social

Figuriamoci il silenzio in bussines! Si riuscirà finalmente a dormire

Le 5 iniezioni hanno questo scopo:

- pilot: ridurre rumorosità, vibrazioni, stress meccanico generati dalla main - Heritage

- pre-main: ridurre NOx - 5 dadi

- main: principale..... - Tre bocchette tonde

- post-main: ridurre PM10 - Quadrilatero

- last: favorire la rigenerazione del DPF

Link al commento
Condividi su altri Social

Crea un account o accedi per lasciare un commento

Devi essere iscritto per commentare e visualizzare le sezioni protette!

Crea un account

Iscriviti nella nostra community. È facile!

Registra un nuovo account

Accedi

Sei già registrato? Accedi qui.

Accedi Ora

×
×
  • Crea Nuovo...

 

Stiamo sperimentando dei banner pubblicitari a minima invasività: fai una prova e poi facci sapere come va!

Per accedere al forum, disabilita l'AdBlock per questo sito e poi clicca su accetta: ci sarai di grande aiuto! Grazie!

Se non sai come si fa, puoi pensarci più avanti, cliccando su "ci penso" per continuare temporaneamente a navigare. Periodicamente ricomparità questo avviso come promemoria.